Infrastructure for existing buildings
An accessible reception node designed for existing buildings.
For the building that already exists
POINT proposes a retrofit reception node at street level, in the entrance hall or on the façade. The solution requires a study of space, structure, accessibility, fire protection and maintenance.
Product in development
The architecture and its possible applications are in the development and validation phase. Each installation and operation would require a specific technical and regulatory study.
Reception, custody and access.
The system is designed to manage the parcel from an entry point until its identified collection.
Reception
A node receives the parcel via the planned ground route or, if validated, via an additional aerial interface.
Custody
The design aims to protect the parcel and record its status until it is requested.
Transfer
The architecture is designed to move the parcel between levels according to the building's layout.
Delivery / collection
Identified access for residents or couriers, subject to the final pilot design.
What needs to be studied in an existing building.
A retrofit project requires a review of the property before deciding on any installation.
Space and structure
Entrance, façade, anchorages, waterproofing and system route.
Use and accessibility
Courier arrival, resident collection and day-to-day circulation.
Safety and maintenance
Fire protection, permits, owners' association and technical access.
What you should know.
Is the system installed and operating?
No. CERES Infrastructure is a product in development and requires physical, site-specific validation.
Do you need a drone to use it?
The architecture is designed around a ground route. Aerial entry would be an addition where technically and legally viable.
Can we assess a specific building?
Yes. The first phase consists of reviewing the building, the intended use and the integration conditions.